Nicholestone Drive Project

The City provided improved surface transportation and roadside drainage by clearing roadside ditches, adjusting utility conflicts, installing culverts with associated pavement repair, and completing associated appurtenances. Construction shall take place at the following locations within the city: Texas Ave. from 28th St. to 38th St; Kansas Ave. from 28th St. to 38th St.; 34th St from Dickinson Ave. to California Ave.; 30th St. from Kansas Ave. to California Ave.; 32nd St. from Kansas Ave. to California Ave.; 38th St. from Kansas Ave. to California Ave.; 39th St. from Texas Ave. to California Ave.

This project benefited four thousand nine hundred eighty-five (4,985) residents. Of these residents, two thousand six hundred eighty-five (2,685), or fifty-three and eighty-six hundredths percent (53.86%), are of low to moderate-income.