The City provided improved surface transportation and roadside drainage by clearing roadside ditches, adjusting utility conflicts, installing culverts with associated pavement repair, and completing associated appurtenances. Construction shall take place at the following locations within the city: Texas Ave. from 28th St. to 38th
St; Kansas Ave. from 28th St.
to 38th St.; 34th St from
Dickinson Ave. to California
Ave.; 30th St. from Kansas
Ave. to California Ave.; 32nd
St. from Kansas Ave. to
California Ave.; 38th St. from
Kansas Ave. to California
Ave.; 39th St. from Texas Ave.
to California Ave.
This project benefited four thousand nine hundred eighty-five (4,985) residents. Of these residents, two thousand six hundred eighty-five (2,685), or fifty-three and eighty-six hundredths percent (53.86%), are of low to moderate-income.